1. Project Overview


Project Name: Shanghai General Motors Short Circuit Tester and Resistance Cabinet Delivery Project


Project Background: SAIC General Motors Co., Ltd. has extremely high requirements for battery system testing, requiring test equipment with high precision, high stability and reliability.


Project Objective: Ensure that the tester system is delivered on time, installed and debugged successfully, and can stably and reliably complete the short circuit test task in actual operation.


2. Project Execution


Delivery process:


Production stage: According to technical specifications and design requirements, the equipment is manufactured and assembled, and strict quality control and testing are carried out to ensure that the equipment performance meets the standards.


Logistics and transportation: Use a professional logistics and transportation company to ensure that the equipment is not damaged during transportation and is delivered to the customer site on time.


Installation and commissioning: Send a professional engineer team to the customer site to install and debug the equipment to ensure that the equipment can operate stably and meet the test requirements.


3. Project Achievements


Equipment performance: The short-circuit tester and resistor cabinet performed well in actual operation, and were able to stably and reliably complete short-circuit test tasks in a short time, meeting the testing needs of the power system.


Customer feedback: The customer was satisfied with the performance and quality of the short-circuit tester and resistor cabinet, believing that it was easy to operate, safe and reliable, and provided strong support for the research and testing of the power system.


Subsequent cooperation: Based on the successful delivery of the short-circuit tester and resistor cabinet project, the two parties established a long-term cooperative relationship to jointly promote the technological progress and development of the industry.



4. Summary


This successful delivery case of the short-circuit machine and resistor cabinet demonstrates the entire process from project planning, execution to achievement display. Through strict technical specifications, standardized delivery processes and a professional service team, the smooth execution and successful delivery of the project are ensured. At the same time, it also provides customers with high-quality, high-performance short-circuit test machine system equipment, providing strong support for the research and testing of power systems.

×